Skip to main content

South half foundation and tunnel plan with details

 File

Scope and Contents

Architect: Trumbauer, Borie, Zantzinger. South half foundation and tunnel plan. Scale 1/2"=1'0". Shows vaccuum pumps, high pres. steam, high pres. drip, low pres. steam, low pres. return. Detail of 10" guides scale 3'=1'0". Detail of 10" pivot anchor scale 3'=1'0". Pipe tunnel a

Dates

  • Creation: 1911-1978

Creator

Conditions Governing Access

Access to unprocessed material is at the discretion of the archivist.

Full Extent

From the Collection: 200 linear feet

Language of Materials

From the Collection: English

Repository Details

Part of the Philadelphia Museum of Art, Library and Archives Repository

Contact:
Philadelphia Museum of Art
PO Box 7646
Philadelphia PA 19101-7646 United States